Amazon cover image
Image from Amazon.com

Project leadership Wendy Briner ; Colin Hastings and Michael Geddes

By: Contributor(s): Material type: TextTextPublication details: Aldershot, England : Gower, c1996.Edition: 2nd edDescription: xi, 163 p. : ill. ; 24 cmISBN:
  • 9780566077852
Subject(s): DDC classification:
  • 658.4/04 20
LOC classification:
  • HD69.P75 B75 1996
Contents:
Contents: Introduction - The Brave New World of Project Management. Part I The Project Leader: What makes a good project leader?; The project in the organization. Part II Preparing the Ground: Understanding the big picture; Managing the sponsor; Scoping. Part III Managing the Project: The project start-up process; Marketing to the stakeholders; Keeping on track; Handing over and winding up. Part IV Action Summary. Index.
Summary: Aiming to provide both a conceptual framework and a set of practical tools for all those who find themselves either permanently or occasionally in the project leader role, this volume details guidance on setting up and maintaining project activity.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Date due Barcode
REGULAR University of Wollongong in Dubai Main Collection 658.404 BR PR (Browse shelf(Opens below)) Available T0035514
REGULAR University of Wollongong in Dubai Main Collection 658.404 BR PR (Browse shelf(Opens below)) Available T0035515

Originally published: New York: Van Nostrand Reinhold, 1990.

Includes bibliographical references and index.

TBS935 UOWD

Aiming to provide both a conceptual framework and a set of practical tools for all those who find themselves either permanently or occasionally in the project leader role, this volume details guidance on setting up and maintaining project activity.

Contents: Introduction - The Brave New World of Project Management. Part I The Project Leader: What makes a good project leader?; The project in the organization. Part II Preparing the Ground: Understanding the big picture; Managing the sponsor; Scoping. Part III Managing the Project: The project start-up process; Marketing to the stakeholders; Keeping on track; Handing over and winding up. Part IV Action Summary. Index.

There are no comments on this title.

to post a comment.